Rocean Box installation
Step 1: Location Requirements
|
![]() |
Step 2: Level the feet
|
![]() |
Step 3: Attach the Mini Ball Valves• Attach and tighten the mini ball valves to the Rocean Box, ensuring a gasket is in place to ensure a tight seal.
|
![]() |
Step 4: Connect the Connectors
|
![]() |
Step 5: Connect the Mini Ball Valves
|
![]() |
Step 6: Connect the Refrigeration Unit to the Rocean Box
|
![]() |
Step 7: Fill the Rocean Box
Recommendation: Use a pre-filter in the hose to prevent limescale deposits, especially in areas with hard water. This will extend the life of the appliance and prevent limescale buildup. Recommended water level: 20 cm from the top. |
![]() |
Step 8: Connect the Refrigeration Unit
|
![]() |
Step 9: Turn on the Cooling Unit and Set the TemperatureWARNING: Do not turn on the Rocean Box until it is filled to the required level. Running the pump without water could immediately damage the unit and void your warranty!
Note: Once activated, the Rocean Box will automatically maintain the water temperature within 1 degree of your selected setting.
|
![]() |